Clear the site of existing debris such as sod and rocks and then level ground. A minimum depth of 80mm crushed rock should then be spread as evenly as possible and compacted using a vibratory compactor ,  a 20mm layer of crusher dust is then added and compact again. Allow a fall for excess water to penetrate through the turf and drain. When compacting continue to add water. This will create a firm base.